Service
Construction Projects
From excavation to the final coat, we take on a defined package of the work on site — and the stages that matter are checked and recorded before the next one covers them.
This is the work on the ground: excavation and foundations, a reinforced concrete or steel frame, walls, roof and façade, mechanical and electrical installations, finishes and external works. What separates it from general contracting is where the scope stops: here we take on a defined package — the structure alone, the façade alone, the fit-out alone — while you, or someone you appoint, hold the design and the overall coordination. If you would rather hand the whole build to one party under one contract, General Contracting is the service you want.
Different buildings ask for different things. An industrial building is governed by spans, loads and the production flow it has to serve; a home is judged on detailing, insulation and how it holds up once people live in it. Remta İnşaat works to a quality standard it set for itself and builds in various parts of Turkey. Our site team signs off the stages that matter before the next one covers them over, because checking after that costs real money.
What to bring
A few things need to be clear before anyone goes on site; bring these to the first meeting and we can put together a realistic schedule.
- Which package you want us to take on: structure, façade, services, fit-out, or some combination
- Construction drawings and, if available, the structural calculations
- The geotechnical report
- Who coordinates the site, and where supervision sits
- Site access, power and water connections, and space to store materials
- Anything that restricts working on site: neighbouring buildings, or your shift pattern if production continues
How it runs
Frequently asked questions
Can you build while my factory keeps producing?
Usually yes, but it changes how the job is planned. The work area is physically separated from production, noisy and dusty operations move to shutdown days or outside shift hours, and deliveries are scheduled around your own traffic. That stretches the schedule — better to allow for it up front than to halt a line halfway through. On the first site visit we go over your shift pattern and your critical lines together.
Does work stop over winter or in wet weather?
Not entirely — the order of work changes. Weather-sensitive operations such as concrete pours, façade and roofing wait for a suitable window, and in the meantime the crew moves onto interior work, services and finishes. We build the season into the schedule from the start, so one bad week does not derail the whole programme.
Delivered projects
What the contract says
Request a quote
Tell us about the project in four short steps. Leave anything you don't know yet blank — we can fill the gaps when we talk. Our office is open Monday to Saturday, 09:00–18:00.