One contract, one party accountable — we run the schedule, the subcontractors and the site, and hand you a finished building.

Get a Quote

General contracting means putting one party in front of the whole job. Instead of managing a dozen separate trade contracts, quotations and coordination meetings yourself, you sign one contract, work to one schedule and hold one company responsible for the outcome. Remta İnşaat has taken on contracting work since it was founded in 2002 and has seen those jobs through.

It suits owners, investors and institutions who do not have — or do not want — an in-house team running a building site. Scope, duration, payment structure and quality standard are written into the contract; from there, choosing and managing subcontractors, procuring materials and running site safety sit with us. You make the decisions; we carry them out and report back.

What to bring

Anything you already have helps us understand the job properly at the first meeting; where there are gaps, we plan how to close them.

  • Architectural and engineering drawings, including any permit-stage set
  • A room schedule, or the standard of materials and workmanship you expect
  • The permit position and, if appointed, your building inspection firm
  • The condition of the site or existing building, and how it can be accessed
  • Your target handover date and any staged occupation you need
  • How you expect payments to be structured, and who signs off decisions

How it runs

Scope and take-off
We work through the drawings and the room schedule to fix the work packages, the quantities and the limits of the job.
Contract and schedule
Handover date, payment terms, quality standard and the change procedure all go in writing before work begins.
Procurement and site set-up
Subcontractors, material flow and the safety regime are tied to the schedule rather than improvised later.
Delivery and handover
Progress reports and payment applications at the intervals set in the contract carry the job through to a snag-free handover, records included.

Frequently asked questions

What is the difference between a lump-sum contract and cost-plus?

Under a lump sum, the scope and the quality standard are fixed in writing and the quantity and procurement risk passes to the contractor to the extent the contract sets out; in return, any change to the scope needs written approval before it is built. Under cost-plus, documented costs pass through to you and the contractor is paid a management fee — far more flexible, but the final figure is not locked in at the start. Which one fits depends on how settled your drawings are, and it is one of the first things we discuss.

What happens if I want to change a material or the design once work has started?

Nobody builds without changing something along the way; what causes disputes is a change nobody wrote down. Every request comes back to you in writing with its effect on the schedule, the sequence of work and the price, and nothing is built until you approve it. Once approved, it is written into the schedule and into the payment structure, so there is no argument at the end about who agreed to what.

All questions

Delivered projects

Hotel

Balıkesir Pelitköy

Delivered

A hotel-category project of 4,000 m2 in Pelitköy, Balıkesir, dated 2022.

CategoryHotel
LocationPelitköy, Balıkesir
Area4,000 m²
Year2022
Residential

Kadıköy Rıhtım

Delivered

A residential job of 70 m2 at Kadıköy Rıhtım, İstanbul, dated 2022.

CategoryResidential
LocationKadıköy Rıhtım, İstanbul
Area70 m²
Year2022

What the contract says

Scope
What the job includes — and what it does not — is written down before work starts. Anything that emerges later sits outside that scope and is priced separately, which removes most mid-build surprises before they happen.
Programme
The staged works programme is an annex to the contract. The order of the stages, and what is handed to you at the end of each one, are set out in it.
Progress payments
Payments are tied to completed work, not to the calendar. Each payment application is submitted together with a report of the work done in that period.
Variations
Change requests are taken in writing. Nothing is built until the effect on price and programme has been put to you for approval.
Handover
At handover the drawings, the documentation for the materials used and the warranty scope are given to you together in a single file.

Get a Quote

Request a quote

Tell us about the project in four short steps. Leave anything you don't know yet blank — we can fill the gaps when we talk. Our office is open Monday to Saturday, 09:00–18:00.

Your request arrives When the form is sent the request goes straight to the office, and a copy of it reaches you by e-mail.
We call you We fill in whatever is missing over the phone, and arrange to see the site if that is what the job needs.
The quote is prepared You receive the scope and the stages in writing. What is not included is named in the same document.
The figure on the title deed — leave it blank if you're not sure.
A rough total for the enclosed area is enough. The final figure depends on what the zoning allows.
Zoning certificate, title deed, any concept drawings, photos of the site. PDF, JPG or PNG. Seeing the documents makes the first conversation much shorter.

Fields marked * are required.

Get a Quote